Before

After

Project Overview
A full master bathroom remodel in the Five Forks area of Simpsonville, SC — replacing a dated jacuzzi-tub layout, dark cherry double vanity, and steel blue walls with an updated master suite. Documented start-to-finish in a single before-and-after walkthrough video.
The Challenge
The original Five Forks master bath was built around an oversized corner jacuzzi tub that dominated the floor plan, a dark cherry double vanity that made the space feel heavy, and steel blue walls with a framed wall mirror and exposed-bulb sconces that read straight out of an early-2000s builder package. The space functioned, but it didn't match the rest of the home or what the homeowners wanted in a master suite.
Our Solution
We documented the entire renovation in a single walkthrough video — before condition, demolition, and the finished space cut together. The remodel modernized the layout and finishes throughout: vanity, lighting, wall finishes, and the tub/shower area. Watch the walkthrough below for the full before-and-after.
Scope of Work
- Full master bathroom remodel — before, during, and after captured in a single walkthrough video
- Removed dated corner jacuzzi tub and reworked floor plan
- Replaced dark cherry double vanity with updated cabinetry and countertops
- Updated lighting, mirrors, and wall finishes throughout
- Modernized tub/shower area with current waterproofing and tile finishes
- Coordinated paint, fixtures, and hardware for a cohesive master-suite look
Materials & Products
- •Updated vanity cabinetry and countertops
- •Modern vanity lighting and mirrors
- •Updated tile and shower/tub wall finishes
- •Wedi or Schluter waterproofing system (industry-standard)
- •Coordinated bathroom hardware and fixtures
- •Updated paint in a modern neutral palette
Video Walkthrough
More Project Photos





Frequently Asked Questions
Why is the before-and-after in one video?
We filmed a continuous walkthrough that cuts from the original bathroom to the finished space so you can see the full transformation in about 30 seconds. It's the clearest way to show what a Five Forks master bath remodel actually looks like start to finish, without scrolling through dozens of staged photos.
What did the original bathroom look like?
An oversized corner jacuzzi tub, a dark cherry double vanity with cultured-marble tops, steel blue walls, a framed wall mirror with exposed-bulb sconces, and dated tile flooring. It's a layout and finish package very common in Five Forks homes built in the late 1990s and early 2000s — the bones are solid but the finishes are heavily dated.
Do you do remodels in the Five Forks area of Simpsonville?
Yes — Five Forks is one of our core service areas. Many of the homes there are now 20+ years old and the original master bathrooms (jacuzzi tub, double vanity in dark cherry, dated tile) are due for an update. We've remodeled several of them and can pull comparable references if you're planning one.
How long did this remodel take?
A master bathroom remodel of this scope — full demo of the jacuzzi corner, new vanity, full tile, paint, lighting, and fixtures — typically runs four to six weeks on-site for a project of this size. Exact timeline depends on tile selection lead time and any rough-plumbing changes.
