Hall and Half Bathroom Remodel with Hexagon Tile Floors | Anderson, SC | Four Seasons Building & Remodeling
HomePortfolioHall and Half Bathroom Remodel with Hexagon Tile Floors
Bathroom Remodeling

Hall and Half Bathroom Remodel with Hexagon Tile Floors

Anderson, SCCustomer: Brett J.

Original project by our sister company Upstate Bath Renewal, used with written permission.

Before

Before: Hall and Half Bathroom Remodel with Hexagon Tile Floors

After

After: Hall and Half Bathroom Remodel with Hexagon Tile Floors

Project Overview

Refreshed both the hall bathroom and the hall half bathroom in an Anderson, SC home — new quartz vanity tops, framed mirrors, hexagon tile flooring with white grout, popcorn ceiling removal, exhaust fan relocation from wall to ceiling, and a brand-new toilet, vanity, and light fixture in the half bath.

The Challenge

Two dated bathrooms in the same hallway: a hall bath with a wall-mounted exhaust fan in the wrong location, a popcorn ceiling, and original flooring; and a half bath with a damaged toilet flange and customer-provided new flooring waiting to be installed. The homeowner wanted both rooms tackled in one project so the hallway reads as a coordinated update.

Our Solution

Hall bathroom: we replaced the vanity and installed a new quartz countertop with backsplash and side splash, added an undermount sink, faucet, vanity hardware, framed mirror, and vanity light. We removed the popcorn ceiling texture, skim-coated the ceiling, completed sheetrock repairs, and patched the old wall opening from the previous exhaust fan. The fan was relocated to the ceiling. We removed the existing flooring and installed new hexagon tile with white grout, then primed and painted ceiling, walls, trim, and the bathroom side of the door. Half bathroom: we removed the existing flooring, replaced the damaged toilet flange discovered during demo, installed the customer-provided flooring, then installed a new toilet, vanity, quartz vanity top with undermount sink, faucet, light fixture, and mirror.

Scope of Work

  • Hall bath: replaced vanity and installed new quartz countertop with backsplash and side splash
  • Installed undermount sink, faucet, vanity hardware, framed mirror, and vanity light
  • Removed popcorn ceiling, skim-coated ceiling, completed sheetrock repairs
  • Patched previous wall opening from old wall-mounted exhaust fan
  • Relocated exhaust fan to ceiling-mounted location
  • Installed new hexagon tile flooring with white grout
  • Primed and painted ceiling, walls, trim, and bathroom side of door
  • Half bath: removed flooring and installed customer-provided flooring
  • Replaced damaged toilet flange discovered during demo
  • Installed new toilet, vanity, quartz top, undermount sink, faucet, light fixture, and mirror

Materials & Products

  • Quartz countertop with backsplash and side splash
  • Undermount sinks
  • Framed mirrors
  • Hexagon tile flooring with white grout
  • Ceiling-mounted exhaust fan
  • Customer-provided half bath flooring

More Project Photos

Anderson SC hall and half bathroom remodel — additional view

Frequently Asked Questions

What rooms were remodeled?

Both the hall bathroom and the hall half bathroom — done in the same project so the hallway reads as one coordinated update.

What flooring was installed?

The hall bathroom received new hexagon porcelain tile with white grout — a timeless small-format pattern that reads modern but won't date the room. The half bath used customer-provided flooring of the homeowner's choice.

Why remove the popcorn ceiling?

Popcorn ceilings collect dust, hide moisture damage in bathrooms, and instantly date a room. Smooth-skim and repaint is one of the cheapest visual upgrades you can do during a remodel — we always recommend it.

Project Details

CategoryBathroom Remodeling
LocationAnderson, SC
CustomerBrett J.
ContractorFour Seasons Building & Remodeling
LicenseSC BS24-000560